APF Epoxy Blog

One-Day Floor? No Odor? No Problem!

Posted August 15th, 2016 by Ray Gutoski in General Blog

Perhaps the most common request flooring contractors hear from their clients is how to install a floor coating quickly, because they just can’t find the down time to do it.   This request isn’t limited to one type of customer. It could be anyone from a residential garage customer to a food and beverage processing facility and everything in between

 

Read More »


 

How to Plan and Organize International Floor Installations

Posted August 15th, 2016 by Carlos Santana in General Blog

As the old adage goes, an ounce of prevention is worth a pound of cure. That’s certainly the case when it comes to planning and organizing international floor installations.   As Arizona Polymer Flooring has grown in size and scope, and gained an international presence, the company has had to adapt to the many challenges of working outside the U

 

Read More »


 

Mastering the Contract: Know What You’re Getting Into Before the Job Starts

Posted August 5th, 2016 by Mark Haen in General Blog

It may just be a piece of paper, but it can quickly prove to be the most important part of any project. Designed to protect both the contractor and customer, a contract should lay out as many relevant and specific points of a particular project to ensure all parties are fully aware of what is anticipated at completion

 

Read More »


 

How to Address Moisture Testing in Your Contracts

Posted August 4th, 2016 by Peter Collins in General Blog

As a flooring contractor, you’re not responsible for moisture in the concrete slab. However, you could be held responsible for any damage caused to the floor coating that you installed, as well as any associated damages, if you did not test for the presence of moisture prior to the coating’s application in order to determine its suitability for coating or covering

 

Read More »